#160 SOS Hyperlite Chamber Operations
Hands on training and theory
Pre-requisites
None.
Duration
2 days on demand
Dates
TBA
Cost
$1,000.00
Topics Covered
- Supporting equipment requirements
- Unpacking/deploying
- Inspection of acrylics
- Assembly
- Patient loading
- Patient predive check
- Medical support
- Record keeping/time keeping
- Loading to a ground transport
- Loading to a fixed wing
- Loading to a rotary wing
- Transport by watercraft considerations
- Altitude compensations required
- Venting procedures
- Travel rates
- Air brakes
- Cleaning procedures